• Ilovethebomb@lemm.ee
    link
    fedilink
    English
    arrow-up
    2
    ·
    2 days ago

    There are individual buildings and industrial installations who have power use in the megawatt range, getting this much power to a charging station is definitely possible, but would need to be coordinated with the grid operator, and require high voltage run directly to the station.